Free shipping & taxes included on all orders
Step-by-step repair guide

EBR83968401 - How to Replace the Main Control Board in an LG Built-In Air Conditioner

This procedure covers access to the main control board, transferring its wire connections to the replacement board, and reinstalling the air conditioner components.

Part number: EBR83968401 · Brand: LG

Unplug the air conditioner before starting. Removing the chassis from its cabinet requires help from another person; support it carefully as you take it out.

Tools and supplies

  • Phillips-head screwdriver
  • Small flat-head screwdriver
  • Towel or blanket
  • Assistant to help remove and handle the unit

Before you begin

  • Disconnect the air conditioner from power before opening it, and keep it unplugged throughout the repair.
  • Use an assistant when sliding the unit out of or back into the cabinet. Set the removed unit on a stable towel or blanket.
  • If you are not qualified to work on appliance electrical components, have a qualified technician perform the repair.

Step-by-step instructions

  1. Remove the inlet cover, filter, and grille — Detach the inlet cover from the top and set it aside. Pull the air filter up and out. Remove the two Phillips screws holding the front grille, then pull the grille outward from the bottom and lift it off. Disconnect the grille's wire connector to remove the assembly completely.
  2. Slide the air conditioner out of its cabinet — If present, remove the two rear screws securing the unit to the cabinet. Remove the two front screws near the lower left and right sides. With an assistant, carefully slide the unit out and place it on a towel or blanket.
  3. Open the control-board housing — Remove the four screws holding the support bracket and set the bracket aside. Remove the screw securing the control-board housing cover and lift the cover off. Use the small flat-head screwdriver to release the control-board frame from the housing.
  4. Remove the old board and transfer the wiring — Remove the four corner screws securing the board. Rotate the board and frame out of the housing. Before disconnecting anything, photograph the wire arrangement for reference. Disconnect all twelve wire connectors and remove the old board from its frame.
  5. Install and secure the replacement board — Align the replacement board in the frame. Reconnect all twelve wires to their corresponding terminals, using the photo to preserve their original positions. Position the board and frame in the housing and snap the frame into place. Reinstall the four board screws, then refit the housing cover and secure it with its screw.
  6. Reinstall the support bracket and cabinet unit — Put the support bracket back in place and secure it with its four screws. With your assistant, slide the air conditioner back into the cabinet. Reinstall the two front cabinet screws. The two rear cabinet screws may be reinstalled if they were removed.
  7. Reinstall the grille, filter, and inlet cover — Reconnect the grille wire connector. Keep the vent lever accessible below the horizontal louver, insert the grille's upper tabs into the frame slots, and position the sides until they snap into place. Secure the grille with its two screws. Fit the filter bottom edge first, then snap its top into place. Align the inlet-cover hinge tabs with the grille slots and snap the top of the cover into position.
  8. Restore power and check operation — After the unit is fully reassembled, plug in the power cord. Check that the air conditioner powers on and operates.

After the repair

Confirm the grille, inlet cover, filter, housing cover, support bracket, and cabinet fasteners are in place. Then plug in the unit and check its operation.

Repair safety: Disconnect power before working on internal parts. Follow the service instructions for your exact appliance model. Contact a qualified technician for hazardous electrical or gas-system work.